RIGHT!!!!
Its taken a long time to get to this stage BUT there is now an opportunity for you mere mortals to get your grubby mitts on a large chunk of unobtanium parts.
We have 6 Paul Bird Motorsport 2008/10 factory frames complete with adjustable swingarm pivot work done.
There are 3 04/05 kit frames with adjustable headstock and swingarm pivots.
There is a full factory engine (190+bhp) with EVERYTHING inc Nova g/box, etc. At least another part engine minus g/box.
Loads of fairings inc at least one full carbon and one full kevlar.
A BRAND NEW WSB spec extended tank with the "tail bone" you sit on.
Several 04/05 factory swing arms, airboxes, some subframes, etc.
If I had time I could build at least 3 full factory bikes with what is there and still have parts left over.
If anyone is serious them PM me.